Cadet Gym Phase 7
United States Air Force Academy, CO
Faith is performing as Prime Contractor for the final phase of a series of projects to renovate and update the Cadet Gymnasium at the USAFA, in Colorado Springs, CO. Current contract funding stands at $15M.
The Phase 7 project work areas include areas on Levels B, A, Ground Level and Mezzanine Level:
- Renovate Raqueteball Courts (Finishes and Lighting)
- Structural floors to 3 of the courts
- Provide Storage Spaces for the athletic department on levels B and A.
East Gym Renovations:
- Provide competition level volleyball venue with the following additions:
- Retractable Seating
- Basketball backstops
- Wood Flooring
- Spaces for athletic equipment storage
- A new pressbox
- New exterior exit
- Complete LED lighting upgrade throughout gym
Tennis Gym:
- Existing Lighting completely replaced with more energy efficient lighting.
Mezzanine Level:
- Offices and restrooms on south side demolished and reconfigured for more efficient use of space
- Restrooms replaced and enlarged.
- Mechanical,plumbing,fire suppression,electrical,lighting,public address,communication and fire alarm systems to be provided in these reconfigured spaces.
Additional Project Elements:
- Replace existing curtain wall.
- Replace exterior marble panels with Aluminum and Glass.
- All design elements, both architecturally and interior design elements to complement materials and colors used in previous phases of the project.
This Phase of the project includes:
Mobilization/Demobilization
Demolition
Boring/Auger
Excavation
Asbestos Abatement
Trenching
Piping and Plumbing