Cadet Gym – Phase 7 – USAFA

Cadet Gym Phase 7

United States Air Force Academy, CO

Faith is performing as Prime Contractor for the final phase of a series of projects to renovate and update the Cadet Gymnasium at the USAFA, in Colorado Springs, CO. Current contract funding stands at $15M.

The Phase 7 project work areas include areas on Levels B, A, Ground Level and Mezzanine Level:

  • Renovate Raqueteball Courts (Finishes and Lighting)
  • Structural floors to 3 of the courts
  • Provide Storage Spaces for the athletic department on levels B and A.

East Gym Renovations:

  • Provide competition level volleyball venue with the following additions:
  • Retractable Seating
  • Basketball backstops
  • Wood Flooring
  • Spaces for athletic equipment storage
  • A new pressbox
  • New exterior exit
  • Complete LED lighting upgrade throughout gym

Tennis Gym:

  • Existing Lighting completely replaced with more energy efficient lighting.

Mezzanine Level:

  • Offices and restrooms on south side demolished and reconfigured for more efficient use of space
  • Restrooms replaced and enlarged.
  • Mechanical,plumbing,fire suppression,electrical,lighting,public address,communication and fire alarm systems to be provided in these reconfigured spaces.

Additional Project Elements:

  • Replace existing curtain wall.
  • Replace exterior marble panels with Aluminum and Glass.
  • All design elements, both architecturally and interior design elements to complement materials and colors used in previous phases of the project.

This Phase of the project includes:

Mobilization/Demobilization

Demolition

Boring/Auger

Excavation

Asbestos Abatement

Trenching

Piping and Plumbing

Project Images